Managing lots
The Manage lots action is offered to the members of the direction who have the Editor or Manager role, and only as long as not all the expected lots have been notified. It remains displayed on a consultation that is not allotted.
Where to find the action
Open the consultation, stay on Consultation Information, then click Manage lots in the Actions block.
The management window
A table lists the existing lots, with two columns:
- Lot’s number: cannot be changed after creation,
- Lot object: editable inline, by clicking the edit icon of the row and then validating.
If the consultation has no lot yet, the table shows “No lot available”.
Adding a lot
The Add a lot button opens a window asking for:
- the lot number: an integer, from 1,
- the lot object: free input.
Creating a lot is irreversible: the lot is created as soon as you click Validate, with no confirmation request. A lot cannot be deleted from this window, because its sub-folders are created in the tree of the consultation. Check the number before validating.
Two possible refusals:
| Message | Cause |
|---|---|
| The batch number must be an integer. | the value entered is not an integer |
| A lot with the same number is already present. | this number is already used in the consultation |
Lot 0 is reserved for internal use: it does not appear in the list and cannot be created.
Lot number in names
How the lot number is written in the lot folder name and in document names is set by the
filing plan. To get a two-digit number (“Lot 03”, “…_03_FDR”), the administrator sets
the NUMLOT field of the plan with the format 00 (Format used in generated names
setting), as in the shipped plan. Without this format, the number is written as is
(“Lot 3”). See Filing plan.
Consultations that are not allotted
On a consultation that is not allotted, there is no lot to manage, and the lot-related columns are hidden in the document lists. A market is notified directly, without choosing a lot.
What about periods?
Periods still exist as a document metadata (Period), but the consultation creation
form does not ask for a number of periods. The framework agreement qualification goes
through the contract type, chosen at creation (see
Creating a consultation).
Last Update - November 5, 2026